ECM Mulch Yardage & Capacity Planner

Capacity planning and truck dispatch

Provided by South Coast Mulch Consulting, LLC

● connecting…

Fleet & pricing settings

How to use this
Each truck is listed with how many yards it hauls per load. Set each truck’s yards and how many loads the fleet does per day. The planner adds it all up to figure out how many yards you can install in a day. Use + Truck / − Truck if the fleet actually changes. Only change a number if your trucks actually change.
0yards / day the fleet can install

Choose month

How to use this
Pick the year and the month you want to work on. Everything below changes to match. “Working days this month” counts Monday–Friday most of the year, and Monday–Saturday during season (September–December), automatically. Change it only for holidays or extra days off. To see a past year, just pick that year and month here and the old numbers come right back.

At a glance

How to use this
This shows all 12 months of the year and how full each one is. A higher percent means that month is more booked up. Click any month to jump to it. Use this to spot which months still have room to sell more work.

Yellow = type. Each evening, bump up Yards Installed; Remaining Yards & Loads Left update for tomorrow.
How to use this
This is your list of jobs for the month — your “property board.” Type the property name, pick the mulch color (it colors the loads on the dispatch board below), and enter Yards Estimated — that number is what drives the truck loads. As crews finish, type what went down under Yards Installed; Remaining Yards updates on its own. Set Status as the job moves: Approved (sold, sits here), then Scheduled (drops into the dispatch board to put on trucks), then Done (finished, comes off the board). Click a Notes cell to open a full note box. The Advanced view button shows the money columns: Billed $, Bid Yds (type the yards you bid — variance needs it), Loads Left, and Variance (Installed minus Bid). If you delete a job by mistake, hit Undo on the black bar that pops up. Click the little flag (⚑) at the end of a row to turn the whole line red — that’s the “look at this property / read the notes” signal for the team. Click it again to clear it. If a job won’t finish before the month ends, click the carry-over arrow (↷) on its row — only the yards not already on this month’s trucks move to next month’s board as a Scheduled job (so next month’s capacity sees them). Loads already sitting on this month’s dispatch board stay here — mark them installed as they go down — and this month’s row closes out as Done.
Property / JobMulch Color Billed $ Bid Yds
(type the yards you bid)
Yards Estimated
(drives truck loads)
Yards Installed Remaining YardsLoads Left Variance
(Installed vs. Bid Yds)
StatusNotes

Capacity

How to use this
This is the big picture for the month. Capacity is how many yards you could install. Scheduled / committed is how much you’ve already sold. Only jobs with a Status of Approved, Scheduled, or Done count toward these numbers — a property listed with no status is just a lead and doesn’t take up capacity. Still to sell is the room you have left. Yards left to lay and Loads left are the work that isn’t finished yet. The bar fills up as the month books out.

Yards by Mulch Color —

How to use this
Total yards of each mulch color scheduled this month, so you know how much of each color to stage in the yard for loading trucks. The color swatches here match the load colors on the dispatch board. Remaining is what's still left to install (total minus what's marked installed). Jobs without a color chosen yet appear under No color set — pick their color up top and they'll sort in.

Dispatch board

· — pick a job, then click + slots to send truck-loads.
How to use this
This is your truck calendar. A job only shows up here after its Status is set to “Scheduled” up top, and it needs Yards Estimated to have loads. Click the job in the row above to pick it — every open + slot lights up in that job’s mulch color to show where you can drop a load. Click a + to place one truck-load; the load takes the mulch color and shows the yards and color name (a load only carries the yards the job actually has left, so small jobs make small loads). Type each driver’s name in the box under the truck. Use the buttons to mark loads: installed (green edge, adds to Yards Installed), rained out (load turns blue and its yards go back to “left to schedule”), or a truck out (one load 🔧 turns amber, or click an empty cell to take the truck out all day, red). To rain out a whole day, click the Rain out button first, then click the day’s header — the column turns blue and every load’s yards go back to be rescheduled. Removing a load also puts its yards back. When the job is finished, set it to “Done” up top — it leaves the scheduling list, but its truck-loads stay on the calendar so you can always look back and see where the trucks went that month. The Run sheet button prints the day’s loads for the drivers.
Mulch: Brown Black Red Gold Spanish Gold Playground Eco Mulch
✓ installed ⌿ rained out (whole load turns blue) 🔧 broke down (whole load turns amber) truck out (whole day) + extra = optional 3rd load over = day overbooked

Step 1: click a job above to pick it — the open + slots light up in its mulch color.   Step 2: click a + to send one truck-load (each load carries that truck’s yards — shown next to the truck’s name — never more than the job has left) to that truck/day — the “+ extra” slot is an optional 3rd load.   Click a load to remove it (yards go back to the job).   Rain out: click the Rain out button first, then click a load to flag it or a day’s header to rain out the whole day — rained yards go back to “left to schedule.”   Mark a truck out: flag one load 🔧, or click an empty cell to take the truck out all day.

Shared board: changes save automatically and show up on everyone else’s screen within seconds. No signal? It keeps working on this device and catches up when you’re back online.